Hasdat, Romania

Hasdat 50MW/100MWh

 300.000 Pledged
1 Backers
0 Days Left
Raised:
1.20%
Goal:  25.000.000
Minimum amount is €24.000 Maximum amount is €800000
5 Campaigns | 0 Loved campaigns

Story

The Hasdat BESS project is a utility-scale, stand-alone energy storage facility featuring a 50MW/100MWh configuration. Strategically designed to mirror the technical excellence of the Sibiu site, Hasdat is currently in an advanced Development Phase, with a clear pathway to reaching Ready-to-Build (RTB) status by early Q2 2026. The project represents a significant addition to the regional energy infrastructure, focused on high-performance grid balancing and merchant energy trading.

The project has successfully hit several critical administrative milestones, with the remaining permits currently in progress:

  • Building Permits (Facility): Fully obtained. All necessary local and regional approvals for the construction of the BESS facility are secured.

  • Cable Route Permitting: Currently in the advanced permitting stage. All documentation has been submitted, and final approvals for the building permit of the cable route are expected shortly.

  • Grid Connection (ATR): The Solution Study for the Technical Connection Permit (ATR) is currently being finalized. This study is the final technical hurdle to defining the grid integration parameters.

  • Target Milestone: The project is on track to achieve full RTB status in April/May 2026.

  • Technology: Lithium-Ion Battery Energy Storage System (BESS)

  • Installed Capacity: 50 MW

  • Energy Capacity: 100 MWh (2-hour duration)

  • System Design: High-density, modular containerized solution featuring liquid-cooled thermal management and advanced Fire Suppression Systems (FSS).

  • Grid Interaction: Designed for full compliance with TSO requirements for Ancillary Services, including Frequency Containment Reserve (FCR) and automatic Frequency Restoration Reserve (aFRR).